In construction projects based in urban environments there is always the risk of damage being incurred from or to surrounding structures. This is particularly the case when the construction work involves high levels of noise or vibration, deep excavation, demolition, dewatering, and so on.
However, it is often difficult to differentiate between pre-existing damage and damage caused by construction works, since few structures are completely free of defects or signs of distress. Post-construction examination can involve comparing photographs and elevation surveys to resolve issues surrounding possible damage having been caused.
When significant construction work, such as demolition or excavation, is to be undertaken near to other structures, the developer must carry out a condition survey to assess how the work could feasibly affect its immediate surroundings. This survey will also be used to identify and record any deficiencies in the site or property, such as the extent of cracking prior to work beginning.
The recordings from this survey are used as a ‘base line’ for identifying damage caused by the planned works. Developers can establish the liabilities that may be incurred by them, allowing them to consider special provisions or limitations about the undertaking of the work activities.
It is standard practice for builders to have suitable Contractor’s all-risk insurance, a policy that covers all risks normally associated with a construction project. This will apply should a builder cause damage to the site or adjacent property while carrying out works.
Activities such as pile driving or soil compaction cause vibration which can result in damage to surrounding structures. Ground deformations known as Raleigh waves decrease in intensity as they travel from the source, but depending on the soil type or the fragility of the adjacent structure, they may be sufficiently strong to cause damage.
Damage can also be incurred by the settlement of the soils supporting a new foundation not being uniform. Deep excavations near to existing foundations, or changes in groundwater levels due to dewatering processes, can also result in settlement which can cause building cracking and other defects.
To avoid or reduce the risks of vibration damage, it is often the responsibility of the contractor to maintain vibration levels at below damage thresholds established by building departments or technical standards.
If the owner of an adjacent property has concerns about the potential for vibration to cause damage, they, or their solicitor, can write to the contractor and/or developer, making them aware of their liability to repair any damage should any be incurred. A vibration monitor can be installed, at the cost of the developers, to record levels of vibration and assess whether structurally-significant movement is taking place.
In the event that the developers continue with the work without taking steps to limit vibration, it can be possible to threaten or obtain an injunction to prohibit construction works until acceptable actions have been taken.
Complaints about construction sites can also be made to the local authority, the police, or, if they are registered, the Considerate Constructors Scheme. Concerns about health and safety can be referred to the Health and Safety Executive (HSE). For more information, see Complaining about construction sites.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Best practicable means.
- Code of construction practice.
- Complaining about construction sites.
- Considerate Constructors Scheme.
- Contractor’s all risk insurance.
- Cracking and building movement.
- Environmental impact assessment.
- JCT Clause 6.5.1 Insurance.
- Latent defects.
- Noise nuisance.
- Nuisance in construction.
- Quiet period.
- Reasonable skill and care.
- Settlement.
Featured articles and news
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.