In construction projects based in urban environments there is always the risk of damage being incurred from or to surrounding structures. This is particularly the case when the construction work involves high levels of noise or vibration, deep excavation, demolition, dewatering, and so on.
However, it is often difficult to differentiate between pre-existing damage and damage caused by construction works, since few structures are completely free of defects or signs of distress. Post-construction examination can involve comparing photographs and elevation surveys to resolve issues surrounding possible damage having been caused.
When significant construction work, such as demolition or excavation, is to be undertaken near to other structures, the developer must carry out a condition survey to assess how the work could feasibly affect its immediate surroundings. This survey will also be used to identify and record any deficiencies in the site or property, such as the extent of cracking prior to work beginning.
The recordings from this survey are used as a ‘base line’ for identifying damage caused by the planned works. Developers can establish the liabilities that may be incurred by them, allowing them to consider special provisions or limitations about the undertaking of the work activities.
It is standard practice for builders to have suitable Contractor’s all-risk insurance, a policy that covers all risks normally associated with a construction project. This will apply should a builder cause damage to the site or adjacent property while carrying out works.
Activities such as pile driving or soil compaction cause vibration which can result in damage to surrounding structures. Ground deformations known as Raleigh waves decrease in intensity as they travel from the source, but depending on the soil type or the fragility of the adjacent structure, they may be sufficiently strong to cause damage.
Damage can also be incurred by the settlement of the soils supporting a new foundation not being uniform. Deep excavations near to existing foundations, or changes in groundwater levels due to dewatering processes, can also result in settlement which can cause building cracking and other defects.
To avoid or reduce the risks of vibration damage, it is often the responsibility of the contractor to maintain vibration levels at below damage thresholds established by building departments or technical standards.
If the owner of an adjacent property has concerns about the potential for vibration to cause damage, they, or their solicitor, can write to the contractor and/or developer, making them aware of their liability to repair any damage should any be incurred. A vibration monitor can be installed, at the cost of the developers, to record levels of vibration and assess whether structurally-significant movement is taking place.
In the event that the developers continue with the work without taking steps to limit vibration, it can be possible to threaten or obtain an injunction to prohibit construction works until acceptable actions have been taken.
Complaints about construction sites can also be made to the local authority, the police, or, if they are registered, the Considerate Constructors Scheme. Concerns about health and safety can be referred to the Health and Safety Executive (HSE). For more information, see Complaining about construction sites.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Best practicable means.
- Code of construction practice.
- Complaining about construction sites.
- Considerate Constructors Scheme.
- Contractor’s all risk insurance.
- Cracking and building movement.
- Environmental impact assessment.
- JCT Clause 6.5.1 Insurance.
- Latent defects.
- Noise nuisance.
- Nuisance in construction.
- Quiet period.
- Reasonable skill and care.
- Settlement.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.